lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty

(10 customer reviews)

£11.99

Size 4.5m/15ft
Colour Orange
Brand lynxking
Material Nylon
Product dimensions 4.5L x 0.01W metres

  • MORE DURABLE: The diameter of the dog leads is 9.5mm, which is the thickness of a long line dog lead suitable for training dogs, it is both strong and portable, more durable and wear-resistant than other dog training leads, and can be used for a longer time. It can withstand the force generated when your dog pulls, jumps or chases things.
  • FOUR LENGTHS: 3M/4.5M/9M/15M, this long training lead for dogs is available in four lengths to meet different training purposes. Great for hiking, camping, training, hunting, backyard, beach, recall training, playing tennis and swimming outdoors.
  • NO KNOTS OR ABSORBENT WATER: The round climbing leash and 360-degree swivel buckle design long dog lead won’t get knotted either in use or when rolled up, made of non-absorbent material, it won’t absorb water and become heavy, which makes it more suitable for use in rainy, muddy or snowy conditions.
  • SOFT HANDLE: The dog training lead has a comfortable double braided handle, the leash’s joints are machine stitched, very sturdy while making it more comfortable for you to hold the leash in your hand.
  • REFLECTIVE SAFETY DESIGN: The training leash has a night time reflective light design, which shows good visibility in low light or when light hits the leash in the darkness, helping you to keep an eye on your pet’s safety.
  • BONUS BACKPACK: In addition, this dog training leads comes with a convenient bag for snacks or picking up litter, the lightweight design and convenient storage allows you to take it with you. It is an ideal companion for enjoying outdoor activities with your pet.

Buy now

Buy Now →

Description


Product Description

long training leash

Lynxking Snap Hook Long leash Dog Lead

A dog lead is used for no pull to ensure safety,for improving our experience walking with our pets. It can be used further for training purpose to train your dog recall,for off leash training and other obedience skills. Lynxking long leash is a perfect choice for training and exercise your dogs. Our long lead check cord is made with high-durability rope,gentle on hand,with a heavy duty swivel hook and a soft padded handle for ultimate comfort,very suitable for in-field or at home training as daily walking,camping,hiking,swimming,beach,backyard playing with tennis balls.

long leash orange

rope dog leash

  • Our dog rope long lead comes in 5 vibrant colors to match with your collar or harness,high visible against any background.
  • 3/8 inch in diameter by 10ft 15ft 30ft 50ft long to meet various training purposes

10ft & 15ft: perfect for daily walking,hiking,ensure safety control

30ft: close ball play,using the potty with freedom

50ft: recall training,off leash training,running with freedom

long leash for walking

Soft Padded Handle

Double layer,soft padded handle to free your hand from rope burns

long leash for hiking

Heavy-duty Swivel Hook

A plated,360 degee rotatable hook to resist tangle in use

dog long lead for hiking

Non-absorbent Material

Made with fine knitted,high-durability rope,ligtweight and non-absorbent,it will float when subermerged in the water.

long lead check cord for large dogs

Easy to Carry and Store

Equipped with a portable backpack for easy carry and store

long leash for small dogs

long leash for medium dogs

long lead for small puppy

long lead for small dogs

Long Training Check Cord

Our dog leash is perfect as a tool for training your dogs. It has enough length to allow your dog wander freely while ensure your command to come obeyed.It will be a powerful aid to teach your dog recall,for off leash training.

No Pull Long Lead

Dogs tend to pull when excited,scared or meeting new furry friend. This long lead proved to be effective to restrain your dog from pulling foward,a no pull solution to ensure safety.

Long Leash for Waking

Walking with our pets is the most everyday activities,which can enhance our bonding experience with our pets. Our check cord is an essential equipment when walking with your dog.

Dog Rope for Exercise

As a further use,it’s also a good choice to use this long lead when exercising with your dog. Now,enjoy the fun of running together with your lovely dog on our lead!

Additional information

Weight 0.24 kg
Dimensions 457.2 × 0.95 × 0.95 cm
Product Dimensions

‎457.2 x 0.95 x 0.95 cm; 240 Grams

Item model number

‎LL-1

Breed Recommendation

‎Small Breeds

Closure

‎Snap

Colour

‎Orange

Size

‎4.5m/15ft

Quantity

‎1

Care Instructions

‎Hand Washable

Special features

‎durable, lightweight

Batteries required

‎No

Batteries Included

‎No

Item Weight

‎240 g

ASIN

B07WPPG9JL

Date First Available

20 July 2019

Manufacturer

lynxking

10 reviews for lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty

  1. mrs katrina kirsopp


    A lead that’s a decent length and of soft texture but strong

  2. Nick


    Great lead, good quality, looks great

  3. MRS JOY SPOONER


    Sturdy lead does what it says good choice of colours ..much nicer than the boring colours

  4. Kindle Customer


    Brilliant slip lead, soft, thick, very well made. Strong and sturdy. Would strongly recommend

  5. Gillian


    Well made and strong help my dogs to stop pulling

  6. Rich


    I literally received this lead about an hour ago tops. Took dog out on first walk with it, feels great in the hand, the extra length over 99% of other slips is amazing.. yet where the lead slides through the ring, there’s already visible fuzzy fraying. That absolutely doesn’t bode well for the next 5 walks.. nevermind 100+The rope isn’t one piece and seems to be a soft cover with a core in the middle and the outside is .. too soft. Such a shame.

  7. Florrie


    I quite like this. Good length , just slips round the neck . The handle has some padding and when I want to make the lead a little shorter I just wrap it round my hand .

  8. Bryony Ridgeway


    Good lead, helping train my dog

  9. Shirley A Essency

    Great leash
    Love this colour for my female dog ! Been using these leashes for several years and price is better than most pet stores .

  10. CADR

    Great tool to use for recall
    I bought this leash so I could maintain control over our new puppy. We like to run our dogs off-leash as much as possible. Using a long leash gives your dog the freedom to play and allows you to practice recall while keeping a safe grip on the pup.its made out of good quality material and easy on the hands

Add a review

Your email address will not be published. Required fields are marked *